Scope
Opportunity description
The objective of this project is to replace two (2) fire pump controllers (FPCs), decommission and remove one (1) legacy foam-releasing control panel and install a new panel for the preaction/wet system. Decommission and remove one (1) High-Expansion Foam (HEF) tank and concentrate storage system. The existing HEF system is locked out from operation and must be removed and disposed of properly. Please see the Scope of Work (Attachment 1) and supporting documents for the full requirement description.